n4.INTERCONNECTION
n
n4.1Customer shall deliver the available
energy to MPC at the meter located on the Customer’s premises.
n
n4.2Customer shall not commence parallel
operation of the Customer Facility until written approval has been provided to it by MPC. MPC shall provide such written approval and shall install
the required meter within ten (10) working days from MPC’s final inspection of the Customer Facility. Such approval shall not be unreasonably withheld.
n
n4.3Customer shall bear all costs for any meter installation,
inspection by MPC, and any costs for unusual metering required. Customer may be required to pay meter reading costs. MPC will invoice Customer who is responsible for payment within
thirty(30) days of receipt of invoice.
n
n5.DESIGN REQUIREMENTS
n
n5.1Customer shall be responsible for the
design, installation, operation, and maintenance of the Customer Facility and shall obtain and maintain any required
governmental authorizations and/or permits.
n
n5.2.Customer shall comply with the requirements of the MPC Net Metering Requirements for Grid Connection of Renewable
Resources (attached hereto as Exhibit A) and the MPC Electric Service Requirements and Guidelines (provided upon request).