n3.INTERRUPTION OR REDUCTION OF DELIVERIES
n
n3.1MPC shall not be obligated to accept
or pay for and may require Customer to interrupt or reduce deliveries of available energy (a) when
necessary in order to construct, install, maintain, repair, replace, remove, investigate, or
inspect any of its equipment or part of its system, or (b) if it determines that curtailment, interruption,
or reduction is necessary because of emergencies, forced outages, force majeure, or
compliance with prudent electrical practices.
n
n3.2Whenever possible, MPC shall give
Customer reasonable notice of the possibility that interruption or reduction of deliveries may be
required.
n
n3.3Notwithstanding any other provision of this
Agreement, if at any time MPC determines that either (a)
the Customer Facility, or its operation, may endanger Montana
Power Company personnel, or (b) the continued operation
of Customer Facility may endanger the integrity of Montana Power
Company’s electric system, MPC shall have the right to
disconnect Customer Facility from Montana Power Company’s system.
Customer Facility shall remain disconnected until such time as
Montana Power Company is satisfied that the condition(s)
referenced in (a) or (b) of this Section 3.3 have been corrected.