7/30/01
summer 2001
46
Cont.
n3.INTERRUPTION OR REDUCTION OF DELIVERIES
n 
n3.1MPC shall not be obligated to accept or pay for and may require Customer to interrupt or reduce deliveries of available energy (a) when necessary in order to construct, install, maintain, repair, replace, remove, investigate, or inspect any of its equipment or part of its system, or (b) if it determines that curtailment, interruption, or reduction is necessary because of emergencies, forced outages, force majeure, or compliance with prudent electrical practices.
n 
n3.2Whenever possible, MPC shall give Customer reasonable notice of the possibility that interruption or reduction of deliveries may be required.
n 
n3.3Notwithstanding any other provision of this Agreement, if at any time MPC determines that either (a) the Customer Facility, or its operation, may endanger Montana Power Company personnel, or (b) the continued operation of Customer Facility may endanger the integrity of Montana Power Companys electric system, MPC shall have the right to disconnect Customer Facility from Montana Power Companys system. Customer Facility shall remain disconnected until such time as Montana Power Company is satisfied that the condition(s) referenced in (a) or (b) of this Section 3.3 have been corrected.
n