n3. INTERRUPTION
OR REDUCTION OF DELIVERIES
n
n3.1 MPC shall
not be obligated to accept or pay for and may require Customer to interrupt or reduce
deliveries of available energy (a) when necessary in order to construct,
install, maintain, repair, replace, remove, investigate, or inspect any of its
equipment or part of its system, or (b) if it determines
that curtailment, interruption, or reduction is necessary because of
emergencies, forced outages, force majeure, or compliance with prudent
electrical practices.
n
n3.2 Whenever
possible, MPC shall give Customer reasonable notice of the possibility that interruption or
reduction of deliveries may be required.
n
n3.3 Notwithstanding
any other provision of this Agreement, if at any time
MPC determines that either (a) the Customer Facility, or its
operation, may endanger Montana Power Company personnel,
or (b) the continued operation of Customer Facility may endanger
the integrity of Montana Power Company’s electric system, MPC
shall have the right to disconnect Customer Facility from Montana
Power Company’s system. Customer Facility shall remain
disconnected until such time as Montana Power Company is satisfied
that the condition(s) referenced in (a) or (b) of this Section 3.3
have been corrected.